[1]陈启辉,*,郭毕钧,等.隧道高位穿越巨型溶洞处置及防护方案研究[J].山东建筑大学学报,2019,34(05):66-73.[doi:10.12077/sdjz.2019.05.011]
 CHEN Qihui*,GUO Bijun,WANG jun,et al.Study on treatment and protection scheme of tunnel crossing from the upper part of giant karst cave[J].Journal of Shandong jianzhu university,2019,34(05):66-73.[doi:10.12077/sdjz.2019.05.011]
点击复制

隧道高位穿越巨型溶洞处置及防护方案研究()
分享到:

《山东建筑大学学报》[ISSN:1673-7644/CN:37-1449/TU]

卷:
34
期数:
2019年05期
页码:
66-73
栏目:
工程实践
出版日期:
2019-10-15

文章信息/Info

Title:
Study on treatment and protection scheme of tunnel crossing from the upper part of giant karst cave
文章编号:
1673-7644(2019)05-0066-08
作者:
陈启辉1*郭毕钧1王军1孙亚飞2于明洋2
(1.山东建筑大学 土木工程学院 山东 济南 250101;2. 中铁十四局集团建筑工程有限公司 山东 济南 250101)
Author(s):
 CHEN Qihui* GUO Bijun WANG junet al.
(School of Civil Engineering, Shandong Jianzhu University, Jinan 250101, China)
关键词:
隧道工程巨型溶洞施工处置安全防护
Keywords:
tunnel engineering giant karst cave construction treatment safety protection
分类号:
U455.49
DOI:
10.12077/sdjz.2019.05.011
文献标志码:
A
摘要:
巨型溶洞岩溶地质情况复杂,严重影响隧道工程的开展,隧道高位穿越巨型溶洞处置难度大,防护工作不易开展,选择合适的处置及防护方案是保证隧道运营、施工安全的重要基础。文章依托黔张常铁路高山隧道高位穿越巨型溶洞项目,针对因溶洞空腔巨大、周壁稳定性差、落石风险高等不利因素所造成的施工处置难题,在详细研究国内11个巨型溶洞处置方案的基础上,制定了线路绕避、回填和桥跨3类共11种巨型溶洞处置方案,经过初步分析确定了回填处置方案,进一步对比4种回填方案后选用洞砟回填+上部注浆的处置方法。同时,为保证施工安全,系统总结了国内巨型溶洞施工安全防护技术,并以此为基础提出了高山隧道巨型溶洞施工安全防护措施,隧道最终顺利通过巨型溶洞。
Abstract:
The karst geological conditions of the giant caves are complicated, which seriously affects the development of the tunnel project. It is very difficult to treat the tunnel passing through the upper part of the giant cave, and the protection work is not easy to carry out. Choosing appropriate treatment and protection scheme is an important foundation to ensure the safety of tunnel operation and construction. This paper relies on the project of Qian-Zhang-Chang Railway Gao-Shan Tunnel which crossing from the Upper Part of Giant Karst Cave. Aiming at the problems of construction treatment caused by unfavorable factors such as huge cavities, poor stability of surrounding rock and high risk of falling rocks, on the basis of a detailed study of 11 treatment schemes for giant karst caves in China, 11 treatment schemes of giant karst caves in three categories of rerouting around, backfilling and bridge crossing were formulated. After preliminary analysis, the treatment scheme of backfilling was determined. After a detailed comparison of the four backfilling schemes, the treatment method of ballast backfilling and upper grouting is finally selected. At the same time, in order to ensure the construction safety, the safety protection technology for the construction of giant karst caves in China is systematically summarized. Based on this, the safety protection measures for the construction of giant karst caves in the Gaoshan Tunnel are put forward and the tunnel eventually passed through the giant karst cave successfully.

参考文献/References:

[1]李鸣冲,张民庆,黎代仁. 宜万铁路高坪1#隧道岩溶发育特征分析与治理[J]. 隧道建设,2006,26(3):68-72. [2]薛斌,申志军. 宜万铁路隧道岩溶规模化处治技术[J]. 铁道标准设计,2010(8):68-72. [3]马涛. 宜万铁路龙麟宫隧道1号大型溶洞处理技术研究[J]. 铁道标准设计,2010(8):125-128. [4]李鸣冲. 宜万铁路龙麟宫隧道穿越大型半充填溶洞综合处理技术研究[J]. 铁道标准设计,2010(8):119-121. [5]何佩军. 野三关隧道穿越高压富水块石充填大型溶洞施工技术研究[J]. 铁道建筑技术,2017(5):85-89. [6]骆文学,刘丽花. 齐岳山隧道+626溶腔综合施工技术研究[J]. 铁道建筑技术,2011(1):33-37. [7]王军,邱敬格,杨凡,等. 隧道掘进爆破对某巨型无水溶洞洞壁危岩体的扰动作用研究[J]. 隧道建设,2018,38(1):41-49. [8]曹校勇,张龙,林永锋. 羊桥坝隧道大型干溶洞处理方案研究[J]. 现代隧道技术,2014,51(4):185-190. [9]李勇良. 云桂客专营盘山隧道穿越巨型溶洞处治技术研究[J]. 铁道建筑技术,2016(2):57-60,74. [10]林本涛,巩江峰. 朱砂堡二号隧道特大型岩溶空腔处理技术[J]. 高速铁路技术,2016,7(3):91-96. [11]张欣. 田德铁路陇外隧道巨型溶洞的处理[J]. 铁道运营技术,2011,17(2):29-31. [12]黄胤超,王少辉,杨凤华. 那丘隧道廊道厅堂式溶洞处治方案比选[J]. 公路交通技术,2016,32(1):109-112. [13]刘齐军,丁永全,邓少军. 龙塘坪隧道大型溶洞处理技术研究[J]. 公路,2012(9):259-261. [14]李学东,程久胜,马来秋,等. 朱家岩隧道特大型溶洞处治方案探讨[J]. 中外公路,2007,27(5):179-183. [15]李锟. 岩湾隧道特大型溶洞处置技术[J]. 隧道建设,2015,35(1):79-82. [16]赵玉龙. 宜万铁路下村坝隧道大型半充填溶洞处理技术[J]. 铁道标准设计,2014,58(6):111-115. [17]叶堃. 新建成贵线玉京山隧道岩溶大厅综合治理研究[D]. 成都:西南交通大学,2018. [18]邱敬格.巨型岩溶条件下高铁隧道超厚回填体路基沉降规律与控制技术研究[D]. 济南:山东建筑大学,2018. [19]张文峰. 穿越巨型溶腔铁路隧道回填路基沉降机理研究[D]. 济南:山东建筑大学,2019. [20]薛斌,张民庆. 云雾山隧道岩溶发育特征及治理[J].中国工程科学,2009,11(12):61-68 [21]郭明. 隐伏溶洞对隧道围岩稳定性的影响规律及鄂西山区岩溶处治技术研究[D]. 济南:山东大学,2014. [22]贺建亮,周辉. 林织铁路隧道岩溶处置技术[J]. 路基工程,2015(6):204-209. [23]张宗钢. 拉之洞隧道溶洞涌泥处理施工技术[J]. 现代隧道技术,2006,43(6):56-59. [24]宋长甫. 龙麟宫隧道大型溶洞支顶加固技术[J]. 铁道标准设计,2007(9):78-79.